Project Date: September 2025
Client: Emirates Link Stratum Reservoir LLC
Location: ICAD 2, Abu Dhabi-UAE
Supplier: ACDC Integrated Electrical Solutions
Status: Completed
Emirates Link Stratum Reservoir is a leading provider of rock, fluid, and stable isotope analysis services, catering to the energy, mining, and agricultural industries. Their Abu Dhabi facility, located in ICAD II, Mussafah, is integral to their operations, supporting critical laboratory equipment essential for high-precision analytical work.
The facility’s operations depend heavily on uninterrupted power supply to maintain the integrity of sensitive analytical equipment. Power interruptions posed a risk to the accuracy and reliability of their analyses, potentially impacting project timelines and client deliverables. Therefore, ensuring a stable and continuous power source was paramount.
Item | Description | Quantity |
1 | 6 kVA UPS with Internal Batteries (AEC IST3J-6) | 1 |
2 | 3 kVA UPS with Internal Batteries (AEC IST3J-3) | 1 |